RISCONORDO
Public

Risk & Roles

Risk Moves. Who Carries It?

A burden can disappear from a report and remain in someone’s day. Read the improvement side by side with the place the burden was passed to.

Synthetic · Simulation/As of

The New Sorting Gate in the Harvest Crew

This question asks where risk moved when a staff change at a vineyard harvest crew slowed the sorting gate, meaning the table where pickers' bins get checked for bad clusters before the truck loads. A veteran crew boss retired and a new boss took the row in early September. The new boss rejects bins that hold one moldy cluster and sends the picker back to the row. The truck waits at the gate and the day runs longer.

Who Asks
vineyard manager who chose the new crew boss
Who Is Affected
pickers paid by weight whose bins get returned
Who Can Revise
winery quality lead who sets the reject standard for incoming loads
Risk Reduced

Risk of spoiled fruit reaching the winery load went down at the sorting gate.

Risk Shifted

Pickers paid by weight now carry lost pay and lost days, and ripe fruit left in thinning rows carries the risk of not being picked.

Traces in This ScenarioInvented, not observed
  • The load sheet shows more bins returned to the row per day after the new boss took over, and truck departure slips run later each afternoon.

  • The crew pay log shows picker totals falling for the same hours worked, and two pickers stopped returning after the first week.

The Assumption

Tighter sorting at the gate protects the whole harvest without changing who earns a day's pay.

The Design Must Stay Revisable

Look again if returned bins rise further after a hot week, or if two more pickers do not come back to the row.

Redesign the Roles