One Sorter At A Faster Belt
This question asks where the risk moved when a recycling depot cut a hand-sort job to save money. The depot sits on the edge of a small river town and bales paper, cans and plastic for sale to mills. Management removed one of two hand-sort positions at the picking line and raised the belt speed so the remaining sorter covers the whole flow. Bales leave the line for buyers who grade the material when it arrives.
- Who Asks
- depot manager who approved the position cut
- Who Is Affected
- the remaining picking line sorter and the bale buyer
- Who Can Revise
- regional operations director who can restore the position or reset belt speed
Repetitive strain and pinch injuries at the removed sort position went down with the job itself.
The remaining sorter now carries the risk of clearing jams alone on a fast belt, and the bale buyer carries the risk of contaminated material.
Jam-clearing entries on the shift handover sheet show the sorter stopping the belt alone after the cut, while the near-miss report book holds no entries since that date.
Bale grading records at the buyer's yard show repeated rejections of loads from this line, with mixed cans and plastic noted inside paper bales.
Removing a sort position only removes a cost, and the sorter keeps the same standard of work at a faster belt.
Look again if the sorter reports a jam-related injury or if a second bale from the same shift is rejected by the buyer.
Redesign the Roles