Who Catches An Unknown Load After The Staff Change
This question asks where risk moved when a recycling depot lost its most experienced sorter. The depot is a large shed where trucks tip mixed material onto a conveyor and staff pick items off it by hand. An interlock was added to the new sorting line, a device that stops the machine whenever a guard is opened. The veteran sorter retired in the same month. Line pace went up under a new schedule set by the depot manager.
- Who Asks
- Depot manager who set the new pace after the retirement
- Who Is Affected
- New sorter working the picking line on the late shift
- Who Can Revise
- Regional safety officer who reviews the depot after the season
Pinch point and jam injuries on the sorting line went down with the interlock in place.
The newest sorter and the facility down the line now carry the risk of an unrecognized contaminated load, since the veteran's eye is gone and flagged loads still pass through to keep pace.
The sorter log shows pace held and jam clearances down since the interlock was added, and the injury book is empty for the season.
Shift notes show the new sorter flagging three unknown loads to a supervisor, and each was passed through to keep pace.
With the interlock in place, the retired sorter's judgment about material is no longer needed on the floor.
Look again if a flagged load is passed through with no supervisor present, or if a load from this depot later ignites or contaminates a bale at the downstream facility.
Redesign the Roles